home / past projects / PHILIPS CSS, INC., Lancaster, PA
EMC Chambers
Pre-scan Emissions/Immunity Chambers
Three Meter FCC Certified Emissions Chambers
Ten Meter FCC Certified Emissions Chambers
MIL-STD 461E & RTCA/DO-160D Chambers
Retrofits and Relocations
High Frequency Chambers
Antenna Measurement Chambers
Compact Range Chambers
RCS/Radome Chambers
Near-field Chambers
Retrofits and Relocations

Project: 3M IMMUNITY/PRE-SCAN EMISSIONS CHAMBER

Client: PHILIPS CSS, INC. Lancaster, PA


Contact: Tony Bianca (717) 735-6336

Size/Description: 12'W x 24'L x 11'H.
3M Immunity/Pre-Scan Emissions Chamber

This chamber enables Philips to perform certification testing for IEC 10000-4-3 immunity requirements as well as pre-scan emissions testing. The design of this chamber provides the space necessary for the addition of urethane foam absorber needed to extend the testing capabilities up to 18 GHz.



Lehman Chambers Scope of Work:

    - design & engineering
    - working drawings and submittals
    - shielded enclosure
    - optimized dielectric / ferrite absorber
    - raised access flooring system
    - testing and certification

Status: Operational
 
Questions or comments?
email: sales@cuminglehman.com