Project: 3 METER CERTIFIED EMC CHAMBER Client: MIRA NORTH AMERICA, Plymouth, MI Contact: Steve English (734) 455-6350 Size/Description: 21'W. x 32'L. x 19'-6"H. Lehman Chambers designed and constructed this 3 meter EMC chamber in accordance with ANSI C63.4-1992, ANSI C63.5-1998 (free space antenna factors) and IEC 10000-4-3 for certified emissions and immunity testing. The facility utilizes a FM200 fire protection to eliminate water damage associated with pre-action sprinklers. The facility has a welded floor structure that is integrated with a modular shielded panel system. It includes a pit to ensure the turntable is flush-mounted with the welded floor structure. A CCTV system is also installed to enable the viewing product testing. ![]() Lehman Chambers Scope of Work: - design/engineering and computer modeling - working drawings and submittals - pour concrete floor slab - install welded floor structure - install turntable pit - install modular panel system - install mechanical/electrical system - install fire protection system - install ferrite tile absorber material - install pyramidal urethane foam absorber material - testing and certification Status: Operational-Listed with FCC |
||
Questions or comments? email: sales@cuminglehman.com |
||