home / past projects / MI-TECHNOLGIES/U.S.A.F., Warner Robins, GA
EMC Chambers
Pre-scan Emissions/Immunity Chambers
Three Meter FCC Certified Emissions Chambers
Ten Meter FCC Certified Emissions Chambers
MIL-STD 461E & RTCA/DO-160D Chambers
Retrofits and Relocations
High Frequency Chambers
Antenna Measurement Chambers
Compact Range Chambers
RCS/Radome Chambers
Near-field Chambers
Retrofits and Relocations

Project: PRISM-COMPACT RANGE/HOST BUILDING

Client: MI-TECHNOLGIES/U.S.A.F., Warner Robins, GA


Contact: David Loveless (678) 475-8311

Size/Description: 40'W. x 85'L. x 30'H.
Anechoic Chamber

Lehman Chambers was contracted by Mi-Technolgies to build a Radome Test Range for the Air Logistics Center at Robins Air Force Base. The project consisted of a self-supporting 40'W x 85'L x 30'H shielded anechoic chamber with a 10'W x 30'L x 9'H control room. A 76'W x 90'L x 38'H host building was constructed to house the anechoic chamber, control room and compact range. The host building also included a staging area, fixture storage room, restroom and mechanical/electrical room.



Lehman Chambers Scope of Work:

    - design/engineering
    - construction drawings and submittals
    - systems design and specifications
    - site work and foundations
    - pre-engineered structural steel building
    - RF shielded chamber/control room
    - RF absorber installation
    - fire protection system
    - HVAC and electrical system
    - CCTV system

Status: Completed
 
Questions or comments?
email: sales@cuminglehman.com