|
|
| home / past projects / AMP, INC., Harrisburg, PA | |
|
Project: 3 METER EMC CHAMBER Client: AMP, INC., Harrisburg, PA Contact: Jim Nadolny (717) 986-5506 Size/Description: 14'W. x 24'L. x 12'H. AMP required their chamber not only to perform well for pre-scan emissions and certified immunity testing, but they also had the need for MIL-STD testing as well. Lehman Chambers was able to model the chamber and determine an absorber configuration that would perform well in the higher frequency band for their MIL-STD testing without degrading the low frequency performance needed for EMC measurements. Lehman Chambers Scope of Work: - design/engineering and computer modeling - working drawings and submittals - install modular panel system - install mechanical/electrical system - install fire protection system - install ferrite tile absorber material - install pyramidal urethane foam absorber material - testing and certification Status: Operational |
|
Questions or comments? email: sales@cuminglehman.com |