Project: 3 METER EMC CHAMBER

Client: AMP, INC., Harrisburg, PA


Contact: Jim Nadolny (717) 986-5506

Size/Description: 14'W. x 24'L. x 12'H.
3 Meter Pre-Scan Emissions/Immunity Test Facility

AMP required their chamber not only to perform well for pre-scan emissions and certified immunity testing, but they also had the need for MIL-STD testing as well. Lehman Chambers was able to model the chamber and determine an absorber configuration that would perform well in the higher frequency band for their MIL-STD testing without degrading the low frequency performance needed for EMC measurements.



Lehman Chambers Scope of Work:

    - design/engineering and computer modeling
    - working drawings and submittals
    - install modular panel system
    - install mechanical/electrical system
    - install fire protection system
    - install ferrite tile absorber material
    - install pyramidal urethane foam absorber material
    - testing and certification

Status: Operational
 