Project: ANTENNA AND RADOME TEST RANGES

Client: NADEP, Jacksonville, FL


Size/Description: (2) 20'W. x 50'L. x 20'H.
Dual Anechoic Chamber Facility

Cuming-Lehman Chambers constructed two anechoic chambers with an adjoining control room for the Naval Air Depot in Jacksonville, FL. One chamber was designed and constructed for antenna measurements and the other chamber was designed and constructed for radome performance verification. The facility included a movable partition in the one chamber, full CCTV and material handling equipment to facilitate testing. FM200 fire protection was installed to eliminate chamber damage due to sprinkler misfire.



Cuming-Lehman Chambers Scope of Work:

    - design/engineering and computer modeling
    - working drawings and submittals
    - construct modular panel system
    - design and install HVAC
    - FM200 fire protection system
    - install electrical system
    - install material handling system
    - install urethane absorbers
    - testing and certification

Status: Operational
 :